The original scope was to make good the ceilings after the removal of existing walls. Unfortunately the ceilings were beyond repair, they were at varying levels and the grid was running in different directions, so we advised that a new ceiling was required.

We stripped out the existing ceilings, temporarily supported the existing light fittings and supplied and installed a 600x600mm AMF Planet square edge tile into a 24mm Ventatec grid system.